Construction

Point of clarification desired; in the rules it implies that 'x+y' is the industrial production, yet in all the projects military or social only 'x' seems to be applied. In effect when divide into cost only x seems to be used. If missing something simple here (entirely possible) or previous report on same would appreciate response. It's possible that am missing a connection btwn mil/soc projects?
204 views 5 replies
Reply #1 Top
John,
I believe it is only a cosmetic problem which Stardock are aware of. The + to production is indeed added, but the remaining turns to completion does not include the + to production. That is why projects are completed much faster than expected (research as well).

paul.
Reply #2 Top
thanx for reply .. was just curious .. like on some of the projects that are supposed to increase say by 100% but set to 10 in the scripts or do other then the 1 increase listed. i'm sure be caught for final but can't help myself when can check the construc scripts against the real results.
Reply #3 Top
Umm...that's still true with 4Z? I made changes that I thought fixed it...
Reply #4 Top
Cari,

It looks fixed to me on 4Z. However, there is a very old report on the planet list sorts by production that is not fixed yet. The three production sorts still sort by the first production amount, not the total, thus 11+0 will show in the list before 10+2 on a descending list.
Reply #5 Top
haven't ck'd 4z ... something about folks wanting me to finish a project, so if fixed great. hope to get a game going tonight as project done (course gotta stay awake to play)